For architecture firms comparing Monograph and BQE CORE, start with where accounting will live. Then test phase billing, resource planning and the scope behind each price against the same project. Both publish architecture workflows; the useful question is which configuration covers the work your firm needs.
Reviewed October 18, 2026. Published by Rizqo. Competitor descriptions refer to official public pages, not independent product testing. Confirm current features, plans and implementation requirements with the vendor.
Start with the accounting boundary
Monograph’s product FAQ explicitly distinguishes its firm-management software from accounting software. BQE CORE’s pricing page lists Accounting as an additional module. Confirm the exact functions, plans and integrations demonstrated by each vendor.
If replacing your accounting system is part of the purchase, involve the person who maintains it. If bookkeeping will remain separate, define the required handoff and test it. Those two situations produce different acceptance criteria.
Compare phase billing and resource planning
Both vendors publish support for fixed and hourly billing. Monograph describes mixed fee types within a project; BQE CORE lists hourly, fixed-fee and percentage billing. Use the same phase and invoice records to check how each handles your billing method.
| Workflow | What to demonstrate |
|---|---|
| Fees and phases | One project with fixed work, hourly services and a scope change. |
| Billing | A draft that accounts for previous invoices and any retainers or expenses you actually use. |
| Resource planning and capacity | Planned hours, team availability and what changes when a project milestone moves. |
| Reporting | The source records, date rules and cost definitions behind the requested report. |
| Bookkeeping handoff | What stays in this product, what moves and who reconciles it. |
| Implementation | Data preparation, supported imports, training and the acceptance check before cutover. |
Monograph’s planning page and BQE’s architecture page describe the broader context. Treat published capabilities as starting points for demonstrations, not proof that your exact workflow is configured.
For capacity forecasting, ask each vendor to move a project milestone and show the effect on planned hours and availability across other projects. Check whether the view includes confirmed work, prospective work or both, and who keeps the underlying plan current.
Use an invoice you understand
Bring a recent anonymized invoice, its agreement and the underlying project records. Ask the presenter to rebuild the relevant billing logic and explain any differences. If the invoice includes an unusual allocation or approval requirement, include that case early.
A simple illustrative check is a $12,000 fixed phase at 50% cumulative progress with $3,000 already billed. The current phase amount is $3,000. Eight separate unbilled hours at $150 add $1,200. The total is $4,200 before adjustments. The worksheet makes the arithmetic visible.
Compare pricing for the same scope
Use Monograph’s current pricing page and BQE CORE’s current pricing page to request the configuration you need. Confirm included people, required modules, billing term, onboarding and data work before comparing totals. The architecture software pricing guide provides a checklist for that comparison.
Evaluate the transition as well as the demo
Request a written proposal covering the required capabilities, onboarding, data work and support. Check what happens to historic invoices, client records and attachments. Decide which system will issue the first invoice after the cutover and how you will prevent duplicated records.
Also have an everyday user perform the ordinary routine: enter time, correct it, find a phase and locate an invoice. Both a principal’s review and a team member’s daily work matter.
Where a narrower option fits
If your practice mainly needs proposals, phase work, manual time and invoicing alongside existing bookkeeping, Rizqo is another scope to evaluate. It does not replace accounting or provide resource scheduling, cost-based profit or utilization calculations.
Read Monograph vs Rizqo and BQE CORE vs Rizqo for those boundaries, or book a demo to inspect a specific requirement.




